Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 39 years, born on 21 January 1986

Moscow, metro station Taganskaya, willing to relocate (Austria, Germany, Spain, Italy, Moscow, Netherlands, USA, France), prepared for occasional business trips

Project manager

550 000  in hand

Specializations:
  • Project manager

Employment: full time

Work schedule: full day

Work experience 18 years 8 months

September 2018currently
6 years 9 months
Kuehne+Nagel

Netherlands, www.kn-portal.com

Transportation, Logistics, Warehousing, International Logistics... Show more

Contract Logistics Solution Engineer
• Application of new tools and software into Solution Engineering community of the company (product ownership, expertise keeping, conduction of trainings, targeted support, maintenance) • Complete warehouse solution engineering (Staff, Equipment, MHE, Surface...) • Site surveys; • Tender documentation analysis and Data analytics • Material flow conception • Creation of calculation models based on data and Assumptions • Selection of Technologies and vendors • Layout design (Demo3D, AutoCAD) • Pricing and response to Quotation 1. Calculated numerous current operations for customer retention and new customer solutions. 2. Created ROI calculation models for number of business cases of innovation technologies implementation. 3. Designed, Visualized and Animated numbers of warehouse layouts in Emulate3D 4. Conducted more then 25 trainings upskilling the engineers using new Solution design tools
October 2014August 2018
3 years 11 months
Toshiba

Russia, www.toshiba.ru/

Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more

Project manager \ Lead engineer (Postal, Sorting and Warehouse automation)
• First contact point to the customer; • Identification of customer needs, interpretation them to technical tasks for project team; • Technical assignment and Functional spec development. • Project structure, Division of works creation; • Project schedule and implementation plan evaluation and development; • Coordination of international project team. Tasks distribution and prioritizing for project members. Followups; • Vendor selection, cost and scope negotiations; • Cash flow and Budget estimation and control; • Contract change management and execution. Addendums development. • Acceptance program creation. Hand over systems through acceptance. • Quality control; • Cash collection; • Risk Assessment/Mitigation • Keeping customer satisfied Results: 1. New Logistic Centre layout and technologic scheme of product flows and mail processing was developed from the scratch. 2. Developed and agreed with customer 8 functional specifications for each subsystem in the project. 3. Two micro parcel sorting machines delivered, installed, commissioned and handed over to the customer through SAT tests. 4. Small parcel sorting machine delivered, installed, commissioned and handed over to the customer through SAT tests. 4. Express mail sorting machine delivered, installed, commissioned and handed over to the customer through SAT tests. 5. Letter sorting machine delivered, installed, commissioned and handed over to the customer through SAT tests. 6. Developed new automated process of import/export mail registration and custom clearance on OCR/VCD and remote technology. 7. Automated mail handling conveyor system developed and installed to distribute mail to the sorters above. 8. Fully established technical support process of delivered equipment (hot line, on site crew, corrective/preventive maintenance, spares management) 9. Project extended to new facility and 3 more sorters (PSM, MPS, LFSM) 10. Single MPS sorters installed at Novosibirsk and St. Petersburg sorting centers.
August 2013October 2014
1 year 3 months
Alstom

Russia, www.alstom.com

Heavy Engineering... Show more

Product development engineer (Vibration monitoring)
• Search of potential customers; • Presentation papers, leaflets, technical documentation preparation for Alstom equipmemt (DCS, Vibration monitoring systems) ; • Holding a presentations of Alstom's Automation systems and Vibration diagnostics system; • Site surveys and determination of customer needs; • Proposals preparation based on personal technical solutions; • Requests for Alstom's foreign equipment manufacturers; • Negotiations and formation of contracts with customers. Results: 1. At the phase of signing the contract for delivery of Vibration Monitoring system for the aggregates of Omsk's plant of polypropylene Poliom Ltd. 2. An update for Diagnostics stand for AlstomRusHydroEnergy was performed with respective training course for engineers.
November 2011August 2013
1 year 10 months
Alstom

Russia, www.alstom.com

Heavy Engineering... Show more

Project engineer (Power plant automation)
• Technical support of tendering team; • Site surveys and determination of customer needs; • DCS and Vibration monitoring systems architecture development; • Distributing control functions between controllers; • Participation in proposals preparation; • Negotiations with customers before the contract formation; • Projects Handover, Kick-off meetings; • Selection of subcontractors and project structure definition; • Selection of 3rd party suppliers; • Purchasing and import procedures for Alstom's equipment; • Alstom's equipment certification; • Project execution in accordance to ISO9001; • Coordination of onshore and offshore parties of the project; • Technical control at all the stages of the project; • Factory acceptance tests (FAT), installation supervision, commissioning; • Hand Over of the Works to the customer. Results: 1. Demo stand for Alstom's diagnostics equipment was designed and manufactured. The presentation of system capabilities was held at the opening of JV enterprise between Alstom and RusHydro for Mass Media with the involvement of the office of the ministers of Bashkortostan representatives at Ufa. 2. Group Active Power Control system, Units control and Vibration diagnostics systems were designed, manufactured and installed for HPP-2 of Kubansky Cascade of HPPs. (International project with the involvement of French and Portuguese specialists)
June 2010October 2011
1 year 5 months
Yokogawa Electric

Moscow, yokogawa.ru/

IT, System Integration, Internet... Show more

Automation engineer
• Projects Handover from commercial department (Handover); • Kick-off meeting; • Scope of supply definition; • DCS and ESD system's architecture development; • Equipment procurement; • Technical Assignment, project and design documents issue; • System integrator's work control ; • Project's time frames control; • Assembly works control; • Factory acceptance tests (FAT); • Production release control, and site readiness to installation control; • Commissioning; • Hand Over of the Works to the customer.; Results: 1. Realized the project of control system (CS) and emergency shutdown system (ESD) for dispatch bay of Antipinsk petroleum plant in Tyumen. (the project realized in short time frames under limited budget) 2. Participation in automation project of new petroleum plant TANECO in Nizhnekamsk for Utilities and Hydrocracking units. (Large international project with the involvement of Yokogawa Japan and Nederland affiliates)
July 2008May 2010
1 year 11 months
Novolipetsk Steel

Lipetsk, nlmk.com/

Metallurgy, Metalwork... Show more

Automation and Mechanisation engineer of category 2
• Site surveys; • Control equipment selection; • Circuit diagrams and project documentation design; • PLC programming; • SCADA systems design; • Installation supervision, commissioning; • Technical support and supervisory of subcontractors projects. Results: 1. Realized the project of automation of trap shooting plates production line.
October 2006August 2008
1 year 11 months
Promnovatsiya Ltd.

Lipetsk

IT, System Integration, Internet... Show more

Design engineer
Control systems and electric power supply systems design
June 2008June 2008
1 month
Avrora JSC

Agriculture... Show more

English Interpreter
Escort of international specialists, synchronous technical translation. Technical literature translation.
March 2008June 2008
4 months
Universita Politecnica delle Marche

Educational Institutions... Show more

Student-Stagier
Designing of automatic course correction system of underwater robot in MatLab, Simulink Power Systems.

Skills

Skill proficiency levels
Ability to define tasks by priority in order to reach strategic goals
Ability to stay focused on key matters in changing environment
Analytical way of mind, ability to work with massive information flows
Leadership Skills
Negotiation skills
Strategic thinking and planning
Stress resistant
Customer Relationship Management
Project management
Training & Development
Engineering

Driving experience

Driver's license category B

About me

Software: • OS Windows, MacOS, MS Office (incl MS Project), Outlook, SAP, Internet • AutoCAD; Visio; MatLab; Simulink Power Systems; VisSim • PLC: Simatic Step7, Concept, Unity Pro, CENTUM, ALSPA, SCADA systems.

Higher education

2010
Post-graduate education, Electrotechnical systems and complexes
2008
Faculty of Economics, Technical translator
2008
Faculty of Automation and Informatics, Automation Engineer

Languages

RussianNative


EnglishC2 — Proficiency


FrenchA1 — Basic


ItalianA1 — Basic


Professional development, courses

2017
Leading Through Change
Lee Hecht Harrison | Penna, Team management
2015
Utilising MS Project Professional 2013 and MS Project Server 2013
PM Expert, Project management
2012
CERTIF1-MFC-S6 Commissioning certification step 1
Alstom Power Systems, Engineering course
2012
CAD01-S6 Controcad short
Alstom Power Systems, Engineering course
2011
Practical methods of efficient risk, changes and project team management
PM Expert, Project management

Tests, examinations

2013
Hogan Assessment
Hogan Assessment Systems Inc., Leadership

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Up to one hour